Espírito Santo Basin · Shell Brasil Petróleo

Manifold PC-10 Abalone (Parque das Conchas)

Manifold PC-10 Abalone (Parque das Conchas), well operated by Shell Brasil Petróleo in the Espírito Santo Basin, Brazil. Decommissioning: planned, expected completion 2040. ANP open data, per-asset dossier on request.

Status
Planned
Type
Well
Field
Parque das Conchas
Installation year
2009
Decommissioning start
2035
Expected completion
2040
Coordinates
-20.05, -38.35

Open on the map →

What the asset dossier contains

One sheet per installation, with a public source (ANP and Ibama) and lookup date on every line. No estimate of mine mixed with what the agencies publish.

  • Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
  • What the operator filed for the asset on ANP’s panel, out to 2059.
  • Federal environmental licence of the installation, as published by Ibama.
  • Decommissioning financial guarantee reported for the field.
  • Operator of the asset, as published by ANP.
  • Timeline: installation, expected start and completion of decommissioning.

Format: PDF sheet with a sources annex. Scope and timing agreed in the conversation.

Other assets in the basin

Assets in this basin (Espírito Santo) →

Veridis Engenharia public catalogue built from ANP open data: name, basin, type, status, operator and years. The official source is the ANP website.