Public panel by Veridis Engenharia with 125 installations being decommissioned in Brazil, from 8 operators (BRAVA Energia (ex-Enauta/3R), Equinor Brasil, Karoon Energy do Brasil, Perenco Brasil Petróleo, Petrobras, PRIO S.A., Shell Brasil Petróleo, Trident Energy do Brasil), by basin, type and status.
Where the data comes from
ANP Production Phase Forecast Panel (PAT/PAP), extracted 03/09/2026 and checked 21/09/2026. R$ 70.3 bn (US$ 14.2 bn) declared by operators for 2025-2029, not estimated by the panel.
Per-asset dossier
On request, at contato@veridisengenharia.com.
Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
What the operator filed for the asset on ANP’s panel, out to 2059.
Federal environmental licence of the installation, as published by Ibama.
Decommissioning financial guarantee reported for the field.
Operator of the asset, as published by ANP.
Timeline: installation, expected start and completion of decommissioning.