Offshore decommissioning in the Santos Basin, Brazil
24 installations being decommissioned in the Santos Basin, Brazil, from 3 operators: status, type and expected completion year. ANP open data.
2
In progress
21
Planned
1
Completed
0
Suspended
PetrobrasBRAVA Energia (ex-Enauta/3R)Karoon Energy do Brasil
Assets in this basin
- Duto MERLUZA-PCABIn progressSubsea pipeline · Merluza2025
- PETROJARL 1 (Atlanta, BRAVA)In progressFPSO · Atlanta2026
- PCU-1 (Urugoa)PlannedFixed platform · Urugua2030
- Duto RUBS (Roncador-Unidade BS)PlannedSubsea pipeline · Roncador2034
- FPSO Atlanta (BRAVA, BS-4)PlannedFPSO · Atlanta2036
- FPSO Cidade de Itajaí (Baúna)PlannedFPSO · Baúna2038
- FPSO Cidade de SantosPlannedFPSO · Mexilhão2038
- FPSO Cidade de AnchietaPlannedFPSO · Baleia Azul2040
- FPSO Cidade de Angra dos Reis (Tupi/Lula)PlannedFPSO · Tupi2040
- P-58 (Parque das Baleias)PlannedFPSO · Parque das Baleias2041
- FPSO Brasil (Lula/Tupi)PlannedFPSO · Lula2042
- FPSO P-66 (Lula Sul)PlannedFPSO · Lula Sul2046
- P-75 (Búzios)PlannedFPSO · Búzios2046
- FPSO P-69 (Lula Extremo Sul)PlannedFPSO · Lula Extremo Sul2047
- P-76 (Búzios)PlannedFPSO · Búzios2047
- FPSO Carioca (Sépia)PlannedFPSO · Sépia2048
- FPSO P-68 (Berbigão-Sururu)PlannedFPSO · Berbigão-Sururu2048
- FPSO P-70 (Atapu)PlannedFPSO · Atapu2049
- FPSO P-71 (Itapu)PlannedFPSO · Itapu2049
- FPSO Guanabara (Mero 1)PlannedFPSO · Mero2050
- FPSO P-77 (Búzios 4)PlannedFPSO · Búzios2050
- FPSO Sepetiba (Mero 2)PlannedFPSO · Mero2051
- FPSO Almirante Barroso (Búzios 5)PlannedFPSO · Búzios2052
- PCM-1 (Merluza)CompletedFixed platform · Merluza2022
What the asset dossier contains
One sheet per installation, with a public source (ANP and Ibama) and lookup date on every line. No estimate of mine mixed with what the agencies publish.
- Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
- What the operator filed for the asset on ANP’s panel, out to 2059.
- Federal environmental licence of the installation, as published by Ibama.
- Decommissioning financial guarantee reported for the field.
- Operator of the asset, as published by ANP.
- Timeline: installation, expected start and completion of decommissioning.
Format: PDF sheet with a sources annex. Scope and timing agreed in the conversation.
Veridis Engenharia public catalogue built from ANP open data: name, basin, type, status, operator and years. The official source is the ANP website.
