Santos Basin · Petrobras

PCM-1 (Merluza)

PCM-1 (Merluza), fixed platform operated by Petrobras in the Santos Basin, Brazil. Decommissioning: completed, expected completion 2022. ANP open data, per-asset dossier on request.

Status
Completed
Type
Fixed platform
Field
Merluza
Basin
Santos
Operator
Petrobras
Installation year
1993
Decommissioning start
2018
Expected completion
2022
Coordinates
-24.32, -43.85

Open on the map →

What the asset dossier contains

One sheet per installation, with a public source (ANP and Ibama) and lookup date on every line. No estimate of mine mixed with what the agencies publish.

  • Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
  • What the operator filed for the asset on ANP’s panel, out to 2059.
  • Federal environmental licence of the installation, as published by Ibama.
  • Decommissioning financial guarantee reported for the field.
  • Operator of the asset, as published by ANP.
  • Timeline: installation, expected start and completion of decommissioning.

Format: PDF sheet with a sources annex. Scope and timing agreed in the conversation.

In the same field: Merluza

Other assets in the basin

Assets in this basin (Santos) →

Veridis Engenharia public catalogue built from ANP open data: name, basin, type, status, operator and years. The official source is the ANP website.