Petrobras: offshore decommissioning assets in Brazil
97 Petrobras installations being decommissioned in Brazil, across 7 basins: status, type and expected completion year. ANP open data.
29
In progress
55
Planned
12
Completed
1
Suspended
Campos Basin (45)
- Poço ABL-1 (Albacora Leste)In progressWell · Albacora Leste2024
- Poço BCM-3 (Bicudo Cluster)In progressWell · Bicudo2025
- PCG-1 (Garoupa)In progressFixed platform · Garoupa2026
- FPSO Cidade de Niterói (Marlim Leste)In progressFPSO · Marlim Leste2027
- P-18 (Marlim)In progressSemi-submersible · Marlim2027
- P-20 (Marlim)In progressSemi-submersible · Marlim2027
- PCB-1 (Corvina)In progressFixed platform · Corvina2027
- PCE-2 (Enchova Central)In progressFixed platform · Enchova2027
- UMS MarlimIn progressUMS · Marlim2027
- FPSO Brasil (Roncador)In progressFPSO · Roncador2028
- P-26 (Marlim)In progressSemi-submersible · Marlim2028
- P-47 (Marlim)In progressSemi-submersible · Marlim2028
- PCA-2 (Carapeba 2)In progressFixed platform · Carapeba2028
- P-37 (Marlim)In progressSemi-submersible · Marlim2029
- FPSO Marlim Sul (P-56)In progressFPSO · Marlim Sul2030
- P-19 (Marlim)In progressSemi-submersible · Marlim2031
- P-08 (Marimbá)In progressSemi-submersible · MARIMBÁN/D
- P-33 (Marlim)In progressFPSO · MarlimN/D
- GLF-12 (Guindaste Flutuante)PlannedUMS · Campos2028
- GLF-13 (Guindaste Flutuante)PlannedUMS · Campos2028
- Duto GAR-CAB (Garoupa-Cabiúnas)PlannedSubsea pipeline · Garoupa2029
- GLF-16 (Guindaste Flutuante)PlannedUMS · Campos2030
- GLF-18 (Guindaste Flutuante)PlannedUMS · Campos2030
- PPG-1 (Pargo)PlannedFixed platform · Pargo2030
- Duto MRL-CAB (Marlim-Cabiúnas)PlannedSubsea pipeline · Marlim2031
- FSC CIMA (Campos)PlannedFixed platform · CIMA2031
- PCR-1 (Caranguejo)PlannedFixed platform · Caranguejo2031
- Plataforma de Namorado 1PlannedFixed platform · Namorado2031
- Plataforma de Namorado 2PlannedFixed platform · Namorado2031
- UMS AlbacoraPlannedUMS · Albacora2031
- Duto SEAM (Espadarte-Albacora-Marlim)PlannedSubsea pipeline · Marlim2033
- SS P-25 (Albacora)PlannedSemi-submersible · Albacora2033
- FPSO P-48 (Barracuda)PlannedFPSO · Barracuda2034
- FSO Cidade de Macaé (Roncador)PlannedFPSO · Roncador2034
- P-31 (Marlim)PlannedSemi-submersible · Marlim2034
- P-51 (Marlim Sul)PlannedFPSO · Marlim Sul2037
- P-57 (Jubarte)PlannedFPSO · Jubarte2039
- FPSO Anna Nery (Marlim)PlannedFPSO · Marlim2047
- FPSO Anita Garibaldi (Marlim-Voador)PlannedFPSO · Marlim-Voador2048
- PCF-1 (Foguete)CompletedFixed platform · Foguete2021
- Poço MLL-1 (Marlim Leste)CompletedWell · Marlim Leste2021
- PNA-1 (Namorado)CompletedFixed platform · Namorado2022
- FPSO Cidade do Rio de Janeiro (Espadarte)CompletedFPSO · Espadarte2025
- PCN-1 (Cacao)CompletedFixed platform · Cacao2031
- PCO-1 (Congro)SuspendedFixed platform · Congro2029
Santos Basin (21)
- Duto MERLUZA-PCABIn progressSubsea pipeline · Merluza2025
- PCU-1 (Urugoa)PlannedFixed platform · Urugua2030
- Duto RUBS (Roncador-Unidade BS)PlannedSubsea pipeline · Roncador2034
- FPSO Cidade de SantosPlannedFPSO · Mexilhão2038
- FPSO Cidade de AnchietaPlannedFPSO · Baleia Azul2040
- FPSO Cidade de Angra dos Reis (Tupi/Lula)PlannedFPSO · Tupi2040
- P-58 (Parque das Baleias)PlannedFPSO · Parque das Baleias2041
- FPSO Brasil (Lula/Tupi)PlannedFPSO · Lula2042
- FPSO P-66 (Lula Sul)PlannedFPSO · Lula Sul2046
- P-75 (Búzios)PlannedFPSO · Búzios2046
- FPSO P-69 (Lula Extremo Sul)PlannedFPSO · Lula Extremo Sul2047
- P-76 (Búzios)PlannedFPSO · Búzios2047
- FPSO Carioca (Sépia)PlannedFPSO · Sépia2048
- FPSO P-68 (Berbigão-Sururu)PlannedFPSO · Berbigão-Sururu2048
- FPSO P-70 (Atapu)PlannedFPSO · Atapu2049
- FPSO P-71 (Itapu)PlannedFPSO · Itapu2049
- FPSO Guanabara (Mero 1)PlannedFPSO · Mero2050
- FPSO P-77 (Búzios 4)PlannedFPSO · Búzios2050
- FPSO Sepetiba (Mero 2)PlannedFPSO · Mero2051
- FPSO Almirante Barroso (Búzios 5)PlannedFPSO · Búzios2052
- PCM-1 (Merluza)CompletedFixed platform · Merluza2022
Potiguar Basin (10)
- PCU-2 (Ubaranas)In progressFixed platform · Ubaranas2025
- PCA-1 (Agulha)In progressFixed platform · Agulha2026
- Plataforma Biquara 1In progressFixed platform · Biquara2027
- Duto GAT-UGN (Agulha-Guamaré)PlannedSubsea pipeline · Agulha2028
- PPS-1 (Pescada)PlannedFixed platform · Pescada2030
- PAX-1 (Xiborongo)PlannedFixed platform · Xiborongo2031
- PLATAFORMA DE ARABAIANA 1PlannedFixed platform · ARABAIANAN/D
- PLATAFORMA DE ARABAIANA 3PlannedFixed platform · ARABAIANAN/D
- PCX-1 (Xareu)CompletedFixed platform · Xareu2022
- UPB-1 (Upaba)CompletedFixed platform · Upaba2022
Sergipe-Alagoas Basin (10)
- PLATAFORMA DE CAIOBA 1In progressFixed platform · CAIOBAN/D
- PLATAFORMA DE CAIOBA 2In progressFixed platform · CAIOBAN/D
- PLATAFORMA DE CAIOBA 3In progressFixed platform · CAIOBAN/D
- PLATAFORMA DE CAIOBA 4In progressFixed platform · CAIOBAN/D
- PLATAFORMA DE ROBALO 1In progressFixed platform · SALGON/D
- PCL-1 (Camorim)PlannedFixed platform · Camorim2031
- PBF-1 (Barra Sul, Furado)PlannedFixed platform · Furado2033
- PGU-1 (Guaricema)CompletedFixed platform · Guaricema2019
- PSGAL-1 (Dourado)CompletedFixed platform · Dourado2020
- Plataforma de Piranema (Piranema Spirit)CompletedFPSO · Piranema2025
Ceará Basin (6)
- PLATAFORMA DE ESPADA 1In progressFixed platform · ESPADAN/D
- PLATAFORMA DE ATUM 1PlannedFixed platform · ATUMN/D
- PLATAFORMA DE ATUM 2PlannedFixed platform · ATUMN/D
- PLATAFORMA DE ATUM 3PlannedFixed platform · ATUMN/D
- PLATAFORMA DE CURIMÃ 1PlannedFixed platform · CURIMÃN/D
- PLATAFORMA DE CURIMÃ 2PlannedFixed platform · CURIMÃN/D
Espírito Santo Basin (4)
Camamu-Almada Basin (1)
What the asset dossier contains
One sheet per installation, with a public source (ANP and Ibama) and lookup date on every line. No estimate of mine mixed with what the agencies publish.
- Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
- What the operator filed for the asset on ANP’s panel, out to 2059.
- Federal environmental licence of the installation, as published by Ibama.
- Decommissioning financial guarantee reported for the field.
- Operator of the asset, as published by ANP.
- Timeline: installation, expected start and completion of decommissioning.
Format: PDF sheet with a sources annex. Scope and timing agreed in the conversation.
Veridis Engenharia public catalogue built from ANP open data: name, basin, type, status, operator and years. The official source is the ANP website.
