Offshore decommissioning in the Potiguar Basin, Brazil
14 installations being decommissioned in the Potiguar Basin, Brazil, from 2 operators: status, type and expected completion year. ANP open data.
5
In progress
7
Planned
2
Completed
0
Suspended
PetrobrasBRAVA Energia (ex-Enauta/3R)
Assets in this basin
- PCU-2 (Ubaranas)In progressFixed platform · Ubaranas2025
- PCA-1 (Agulha)In progressFixed platform · Agulha2026
- Plataforma 3R-4 (Macau)In progressFixed platform · Macau2026
- Plataforma 3R-5 (Macau)In progressFixed platform · Macau2026
- Plataforma Biquara 1In progressFixed platform · Biquara2027
- Duto GAT-UGN (Agulha-Guamaré)PlannedSubsea pipeline · Agulha2028
- PPS-1 (Pescada)PlannedFixed platform · Pescada2030
- PAX-1 (Xiborongo)PlannedFixed platform · Xiborongo2031
- Plataforma 3R-20 (Oeste de Ubarana)PlannedFixed platform · Oeste de UbaranaN/D
- Plataforma 3R-21 (Oeste de Ubarana)PlannedFixed platform · Oeste de UbaranaN/D
- PLATAFORMA DE ARABAIANA 1PlannedFixed platform · ARABAIANAN/D
- PLATAFORMA DE ARABAIANA 3PlannedFixed platform · ARABAIANAN/D
- PCX-1 (Xareu)CompletedFixed platform · Xareu2022
- UPB-1 (Upaba)CompletedFixed platform · Upaba2022
What the asset dossier contains
One sheet per installation, with a public source (ANP and Ibama) and lookup date on every line. No estimate of mine mixed with what the agencies publish.
- Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
- What the operator filed for the asset on ANP’s panel, out to 2059.
- Federal environmental licence of the installation, as published by Ibama.
- Decommissioning financial guarantee reported for the field.
- Operator of the asset, as published by ANP.
- Timeline: installation, expected start and completion of decommissioning.
Format: PDF sheet with a sources annex. Scope and timing agreed in the conversation.