Potiguar Basin · BRAVA Energia (ex-Enauta/3R)
Plataforma 3R-5 (Macau)
Plataforma 3R-5 (Macau), fixed platform operated by BRAVA Energia (ex-Enauta/3R) in the Potiguar Basin, Brazil. Decommissioning: in progress, expected completion 2026. ANP open data, per-asset dossier on request.
- Status
- In progress
- Type
- Fixed platform
- Field
- Macau
- Basin
- Potiguar
- Operator
- BRAVA Energia (ex-Enauta/3R)
- Installation year
- 1991
- Decommissioning start
- 2023
- Expected completion
- 2026
- Coordinates
- -5.06, -36.37
What the asset dossier contains
One sheet per installation, with a public source (ANP and Ibama) and lookup date on every line. No estimate of mine mixed with what the agencies publish.
- Status of the decommissioning process on ANP’s panel (PDI and RDI), with the dates the panel shows.
- What the operator filed for the asset on ANP’s panel, out to 2059.
- Federal environmental licence of the installation, as published by Ibama.
- Decommissioning financial guarantee reported for the field.
- Operator of the asset, as published by ANP.
- Timeline: installation, expected start and completion of decommissioning.
Format: PDF sheet with a sources annex. Scope and timing agreed in the conversation.
In the same field: Macau
Other assets in the basin
- PCU-2 (Ubaranas)In progressFixed platform · Ubaranas2025
- PCA-1 (Agulha)In progressFixed platform · Agulha2026
- Duto GAT-UGN (Agulha-Guamaré)PlannedSubsea pipeline · Agulha2028
- PPS-1 (Pescada)PlannedFixed platform · Pescada2030
- PAX-1 (Xiborongo)PlannedFixed platform · Xiborongo2031
- PLATAFORMA DE ARABAIANA 1PlannedFixed platform · ARABAIANAN/D
- PLATAFORMA DE ARABAIANA 3PlannedFixed platform · ARABAIANAN/D
- PCX-1 (Xareu)CompletedFixed platform · Xareu2022
Veridis Engenharia public catalogue built from ANP open data: name, basin, type, status, operator and years. The official source is the ANP website.
